Project portfolio – Royal Arsenal, Phase 9
Project Summary
Project Value to NSP (500k)
2No. Mechanical push/pull AOV shafts with adiabatic cooling - all
blocks above 20 levels
6000m
2
Car Park to be partitioned in phase 1 and then released in full
12months later in Phase 2. featuring temporary extract location,
moving and using the same main extract fans from Phase 1 (most
economically viable).
Equipment:
13No. 60N Induction Fans
2No. 23.05m3s - 1 Extract fans (1600mm dia )
15No. CO Detectors
60No. Smoke Detectors
Attenuation to meet NR55 (internally) & 55dBA @ 3m (externally)